Decontamination work
Urstein landfill – Salzburg
Operational planning and transport of 550,000 tons of building residues
Disposition und Transport von 550.000 t Baurestmassen
Böhler Uddeholm – expansion Meerbusch – Düsseldorf part of the Meerbusch Strabag-Böhm consortium
Clearing, cleanup, and disposal of the pickling smut basins
Approx. ~ 140,000 tons excavating materials and contaminated sediments
Decontamination N54 of the “Ternitz landfill for pickling smut“ as part of the SB Ternitz consortium
Site facilities and operation’s planning; excavation, loading and transport of the contaminated excavation material; disposal of
~ 90,000 tons
Clearing the Grosswarasdorf tire landfill as part of the AVE-Böhm consortium for clearing the tire landfill
Site facilities, planning of operation, loading, transport, and disposal/reuse of old tires amounting to
~ 2,500 tons
Dismantling of the Pilkington glass factory in Brunn/Gebirge as part of the Böhm-Saubermacher consortium
Demolition work, selective dismantling, disposal of demolition material, recycling of concrete, clay tiles, and asphalt, disposal of contaminated excavation material of ~ 150,000 tons
Decontamination work VCF – Vereinigte Chemische Fabriken as part of the Böhm-Saubermacher consortium
Decontamination work, building demolition, and surface cleaning
Clearing of the Recyclingpoint Blumau as part of the Recycling Point Blumau AVE-Böhm-ELA consortium
Site facilities, operation’s planning, sorting, loading, transport, and disposal of ~ 80,000 tons of waste
Clearing of the Fischerdeponie – Theresienfeld as part of the Böhm-Haider consortium
Site facilities, operation’s planning, loading, transport, and disposal of contaminated sediments/waste of
~ 1.6 million tons